Re-Routing Sanford Mall Water Lines

Aerial of Sanford Mall
Status: 
In Design or Bid
Start Date: 
June 2020
End Date: 
February 2021
Project Budget: 
$600,000

In conjunction with the renovation of Sanford Hall, the utility corridor serving Sanford Hall is being reconfigured. Hot water and chilled water lines for HVAC are being rerouted from the Regional Utility Building located behind the University Bookstore  through Sanford Mall.