Project Description Files Updated date
Rankin Science North - Phase II Envelope Repair

Repair failing building envelope for Rankin Science North.  Project includes the installation of through-wall flashing and helical ties, and several other repair methods.  Project begins April 2019 and is expected to last through summer.

02/07/2019 - 10:55am
Stadium Lot Connector

This project will create a mainly pedestrian thoroughfare that can have vehicular use when high volume events take place. It will create an additional egress from the Stadium Parking lot to Rivers Street.  The proposed path travels from the Stadium Parking lot in between Wey and Newland Hall turning northward to join into the Schaefer Center parking lot/circle area.  This will allow use of the traffic signal at Schaefer Center/Rivers Street, and the Peacock Parking Lot.  The project will also include a new sidewalk on the north side of the entrance to the Peacock Parking Lot extending to existing sidewalk.

01/11/2019 - 4:36pm
Garwood Roof -Building Engineer

Appalachian State University, in Boone, North Carolina is seeking qualification statements for Building Envelope Engineering services for the Garwood Hall Roof Replacement project, a general contractor delivered project that is scheduled to begin in Summer 2019.   The project budget is $1,200,000.  Qualification submittals are due by 3pm on November 21, 2018.  

11/01/2018 - 8:32am
Track, Tennis, Softball Relocation - Appalachian 105

Appalachian State University is accepting proposals for a Construction Manager at Risk for the Track, Tennis, Softball Relocation until February 1, 2019 at 4:00 PM in the Office of Planning, Design & Construction at 438 Academy Street, Boone, NC.

This project will completely relocate the Track, Tennis, and Softball facilities from the main campus to the southern portion of the Appalachian State University 105 Property.  A high school was previously located on this property and the new track, tennis and softball facilities will be located in the same area as the former sports fields. The project has an estimated construction budget, including CMR fees, of $11,700,000. 

02/11/2019 - 1:09pm
Stadium End Zone Project

The $43 million facility will replace the 45-year-old Owens Fieldhouse, which is approximately 34,500 square feet. It will include athletic training, hydrotherapy and locker rooms, and nutrition science research areas, as well as conference and continuing education training space, medical office space, dining facilities, a team store and ticketing office, approximately 1,000 premium seats, and offices for coaches and athletics staff. Additional project requirements will be given to the teams that are short listed and/or selected.

Project Schedule

Advance Planning.....Complete

Schematic Design/Development Design Combined......Complete

Construction Documents.....Feb 2019 - Jul 2019

Construction..... Jun 2019 - Aug 2020

DPR Construction has been chosen as the CMR.

NEW - Commissioning Agent Scope Statement uploaded 1/30/19.  Submissions due by 2/14/19 at 4pm.

01/30/2019 - 10:49am
Wey Hall Interior Renovation

This project will renovate the third floor and portion of first floor of Wey Hall. 
Third floor consists of College of Fine Arts design studios that need to be 
reconfigured for more efficient space utilization. First floor renovation will include entrance modifications and a small art gallery space.

**LS3P has been selected as the Designer.  The project is currently in design.

09/14/2018 - 4:39pm
Stadium Lot Steam & Condensate

The project consists of selective demolition, trenching, backfill and compaction, and precast manhole installation for 930 linear feet of new high-pressure steam and condensate return installation to Kidd Brewer Stadium, and buildings 100 and 200 of the public/private partnership housing project. It will also provide loop redundancy between the 1965 Stadium Lot steam line and 1972 Justice/Quinn Center steam lines.

*Dewberry Engineering has been selected as the Designer.

 

 

02/28/2019 - 9:07am
Sanford Hall Comprehensive Renovation

Complete renovation and modernization of 73,913 GSF Sanford Hall.   The renewal project will gut and replace the 50-year-old building’s  mechanical systems, including HVAC, plumbing and electrical systems; as well as windows, roofing, fire alarm system, elevator system(s), and IT infrastructure.    Total project budget is $18,006,545.

Project Schedule

Advance Planning......Complete

Schematic Design/Development Design Combined......Dec 2018 - Feb 2019

Construction Documents.......Mar 2019 - Jul 2019

Construction......Aug 2019 - Nov 2020

NEW - Advertisement for Professional Commissioning Services uploaded 1/30/19.  Proposals due by 2/14/19 at 4pm.

CM@R firms will be interviewed on January 24, 2019.

LS3P is the Designer.

01/30/2019 - 10:50am
Peacock Hall & Rankin West Restroom Renovation

The Rankin Science West portion of the project is slab demolition with unsuitable soil remediation, grout injection, and the addition of new Men’s, Women’s and Family style restrooms in Rankin Science West.  The Peacock Hall portion of the project is the renovation of 4 floors of Men’s and Women’s restrooms, two individual restrooms, housekeeping closets and elevator interior cab finishes.  The project includes Architectural, MEP/FP, and Structural.

*Green Construction began demolition in January 2019.

01/15/2019 - 4:44pm
Poplar Grove Child Development Center Expansion

Advance Planning
This project will expand the university's Poplar Grove Child Care facilities to serve an additional 100 children in age groups spanning infant to preschooler. Expanded outdoor playground facilities are part of the program.

*A Clark Nexsen study  will be completed in May 2019.

01/15/2019 - 4:45pm